This job involved funneling water from different drainages into a culvert. This particular area had experienced multiple failed attempts at water diversion in the past. By carefully observing where the water originated during heavy storms, we were able to design an effective solution. As a result, this trail crossing is now accessible throughout the winter months.

Previous
Previous

Bridge Installation

Next
Next

Property Grading